Plastics manufacturingPlovdiv, Bulgaria
How GENKRAFT cut voltage-related scrap for a Plovdiv plastics plant

Equipment
GK-S250, SDEC engine, 250 kVA, standard line
The challenge
Plovdiv is Bulgaria's manufacturing heartland, and a plastics producer there was losing batches whenever voltage dips interrupted its injection molding cycles.
What we delivered
We supplied a 250 kVA backup set with clean, fast transfer, sized to protect the production line.
The impact
Molding cycles no longer have to be restarted after a power event. That directly reduced scrapped product and gave the plant a steadier output it can actually plan around.