Data center and colocationLeipzig, Germany
How GENKRAFT protected uptime for a Leipzig colocation data center

Equipment
GK-P800, Perkins engine, 800 kVA, premium line
The challenge
Leipzig has grown into an active colocation market, and a Tier III operator there needed guaranteed standby power to hold the uptime it promises its clients.
What we delivered
We installed an 800 kVA standby set as part of an N+1 configuration, tuned for fast and clean load pickup when utility power fails.
The impact
The generator takes the full IT and cooling load inside the site's transfer window, so a grid outage is now a non-event. The operator keeps its service commitments intact, which for a colocation business is the whole product.