Genkraft
Back to case studies
Port operationsGdansk, Poland

How GENKRAFT secured reefer power at a Gdansk port terminal

How GENKRAFT secured reefer power at a Gdansk port terminal
Equipment

GK-C1250, Cummins engine, 1250 kVA, premium line

The challenge

Gdansk is the Baltic's main deepwater container gateway, where refrigerated containers waiting on the quay have to stay powered without interruption.

What we delivered

We supplied a 1250 kVA prime set sized to cover peak reefer demand, with headroom to run in parallel with a second unit as volumes grow.

The impact

The terminal can keep its full reefer bank powered even at peak load. That protects temperature-sensitive cargo on site and gives the operator a clear path to scale as throughput keeps rising.