Back to case studies
Port operationsGdansk, Poland
How GENKRAFT secured reefer power at a Gdansk port terminal

Equipment
GK-C1250, Cummins engine, 1250 kVA, premium line
The challenge
Gdansk is the Baltic's main deepwater container gateway, where refrigerated containers waiting on the quay have to stay powered without interruption.
What we delivered
We supplied a 1250 kVA prime set sized to cover peak reefer demand, with headroom to run in parallel with a second unit as volumes grow.
The impact
The terminal can keep its full reefer bank powered even at peak load. That protects temperature-sensitive cargo on site and gives the operator a clear path to scale as throughput keeps rising.