Mineral processingAktobe, Kazakhstan
How GENKRAFT gave an Aktobe mineral processing site reliable prime power

Equipment
GK-D500, Doosan engine, 500 kVA, standard line
The challenge
The Aktobe region is a center of chromite and ferroalloy work, where processing sites often sit far from a stable grid and cannot afford unplanned stops.
What we delivered
We supplied a 500 kVA set running as the site's prime power source, built for continuous duty and cold-climate operation.
The impact
The operation now runs around the clock on its own power. Grid dependence stopped being a cause of lost production, and the site held a steady, predictable output right through the winter season.